Guangdong Heyuan Longchuan 35 kV Yanzhen power transmission and transformation project

PubDate:2019-12-25Author:Sources:Views:14026

The station was completed and put into operation in December 2017, which provides large-capacity power supply guarantee for many important loads in the urban area. Zhengchao Electric provides 22 sets of 10kV fixed switchgear for the station. The products have been put into operation so far, with safe and stable performance, large capacity and low temperature rise, and are well received by users.